Follow us :

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150
HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150
group name
Metal Coil Decoiler / Uncoiler
Min Order
1 piece
brand name
HongEr
model
DBMT-150
Nearest port for product export
Shenzhen Port, Jieyang Port, Shanghai Port, Tianjing Port
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FAS, CIP, FCA, CPT, DEQ, DDP, DDU, Express Delivery, DAF, DES
Acceptable payment methods
T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Westem Union, Cash, Escrow
update time
Fri, 28 Dec 2018 11:21:42 GMT

Paramtents

  • Coil inner diameter 460-540 mm

  • Coil outer diameter Up to 1200 mm

  • Coil width Up to 150 mm

  • Coil thickness 0.35-1.6 mm

  • Coil weight 250 kg*2

  • Double Decoil speed 16-24 m/min

  • Double Decoiler expansion Manual / Hydraulic for option

  • Double Decoiler pressing arm Optional

  • Double Decoiler warranty 12 months

Packging & Delivery

  • Min Order1 piece

Briefing

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150 can load 150 mm wide and 500 kg in total, 250kg on each side.

Detailed

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150

Max. Coil width 150mm
Coil Thickness 0.1-1.6mm
Max. Coil weight 250kg*2
Coil inner diameter 450-530mm
Coil outter diameter 1200mm
 Saves time for changing coils, thus improving the production efficiency.

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150


Picture for reference

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150


Details

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150


Application

HongEr Dual Mandrel Decoiler / Uncoiler DBMT-150

Packaging

HongEr Machine Wraps the double decoiler in nylon properly, and then fix them into wooden boxes.

Shipping


HongEr Machine delivers the machines via sea freight. It can take about 5-60 days to arrive depending on the distance. You can choose FOB Shenzhen or CIF to your port. We suggest CIF.

Lead time


HongEr Machine manufactures decoilers within 5-10 workdays, depending on the model.

If you are interested, please freely send us an email to: hazel..........com